Response_Letter_EML-2021-10357_.pdf
Response_Package_EML-2021-10357.pdf
FOI Request - EML-2021-10357 Records showing the cost of the feasibility study for the construction of a weir on Koocanusa Reservoir. The work was conducted by BGC Engineering Inc. for the Ministry of Energy and Mines with a draft report submitted on Nov 19, 2020. A public meeting was held on this topic on January 12, 2021. (Date Range for Record Search: From 1/1/2020 To 1/19/2021) FOI Request FOI Request 2023-02-10 Energy, Mines and Low Carbon Innovation 2 2023
Response_Letter_EML-2021-10357_.pdf Response_Package_EML-2021-10357.pdf Individual $0.00