Response_Letter_FNR-2016-60484.pdf
Response_Package_FNR-2016-60484.pdf
FOI Request - FNR-2016-60484 Regarding the Tyson Creek Hydro project: All correspondence and documentation sent to the Ministry that pertains to, and shows, a Professional Engineers Seal on both the as built drawings and on the associated schedule of construction practices to be followed for the lake tap portion of the Tyson Creek Independent Power Project built by Renewable Power Corporation for the period of 01/01/2007 to 06/30/2010; Copies of pages from the welders logbook that performed welds on the Tyson Creek Hydro project penstocks, specifically from the powerhouse elevation up to a 345 foot elevation above, including pages from the logbook that show the welder's pressure vessel credentials for the period of 01/01/2007 to 12/31/2009; Copies of test certifications for the steel used in penstock construction for the Ministry approved Tyson Creek Hydro project, including all records of correspondence between the Ministry and their Independent Engineer retained to oversee commissioning of the Tyson Creek Hydro project as built by Renewable Power Corporation, as related to said test cert's for the period of 01/01/2007 to 12/31/2009; Copies of all Non Destructive Testing inspections of welds on the Tyson Creek Hydro projects, including all correspondence to and from the Ministry pertaining to this subject, from the powerhouse elevation up to lake tap elevation for the period of 01/01/2007 to 12/31/2009; All correspondence relating to lake tap, penstock and powerhouse integrity report after earthquake of magnitude 3.4 on Feb 14,2014 with epicenter within 5km, as relating to Tyson Creek Hydro project for the period of 02/13/2015 to 12/31/2015. FOI Request FOI Request 2016-03-23 Forests, Lands and Natural Resource Operations 3 2016 Response_Letter_FNR-2016-60484.pdf Response_Package_FNR-2016-60484.pdf Individual $70.00