FOI Request - TRA-2018-84651 Any and all records since first construction to July 11, 2018 related to Verdier Avenue, Brentwood Bay B.C., including but not limited to the construction and installation of the roundabout at the intersection of Verdier Avenue and Highway 17A. Records should include Design Drawings, As-Built drawings relating to drainage pipes installed at or near the roundabout, engineering reports related to drainage on Verdier Avenue, drainage and groundwater studies conducted in Brentwood Bay, reports regarding flooding on Verdier Avenue, and photographs showing date and time if possible, of water flow off or near Verdier Avenue. FOI Request FOI Request 2019-04-05 Transportation and Infrastructure 4 2019
Response_Letter_TRA-2018-84651.pdf Response_Package_TRA-2018-84651.pdf Law Firm $135.00