Response_Letter_TRA-2018-86327_.pdf
Response_Package_TRA-2018-86327.pdf
FOI Request - TRA-2018-86327 Regarding the EGRT Construction Inspection report for Technical Memo Inspection report for Bored Tunnel Liner Segments with Concrete Curing Temperatures over 70 C, dated 28 Nov. 2017, copies of these attachments: Simplified Map for finding Overheated Segments on Walkthrough in Evergreen Tunnel (1 page); Metro testing Schmidt Hammer Testing Results (2 pages); Overheated Tunnel Liner Inspection Sheets (54 pages); Supplemental Agreement #1 fully executed on Oct. 31, 2016 (10 pages). FOI Request FOI Request 2019-03-12 Transportation and Infrastructure 3 2019 Response_Letter_TRA-2018-86327_.pdf Response_Package_TRA-2018-86327.pdf Media $0.00