Response_Letter_EGM-2016-61848.pdf
Response_Package_EGM-2016-61848.pdf
FOI Request - EGM-2016-61848 Records that Mines Permit Q-8-094 Mine No. 1610355 requires on an annual basis: Section 32. Geotechnical, sub section 1 Design and Construction, part f) Quality Assurance/Quality Control (QAQC) report the site; Section 32. Geotechnical, sub section 2. Operation and Monitoring, part a) Operation, Maintenance, and Surveillance (QMS) manual; Section 32. Geotechnical, sub section 3. Reporting, part a) Annual inspections of the contaminated soil storage facility shall be undertaken by a qualified Professional Geotechnical Engineer with a report; Section 33. Completion of the cell, part h) The Manager shall, by March 31 of each year, provide the Inspector a report identifying the volume of water treated through the treatment plant, and shall include all operating costs associated with the operation and maintenance of the treatment plant. (Date Range for Record Search: From 01/01/2015 To 04/22/2016) FOI Request FOI Request 2016-09-22 Energy and Mines 9 2016 Response_Letter_EGM-2016-61848.pdf Response_Package_EGM-2016-61848.pdf Individual $0.00